Available Investment Opportunities |
http://ico-dc.org/en/wp-content/uploads/2021/06/الخارطة-الاستثمارية-لعام-2021.pdf |
|
|
Establishing Industrial Company for Medicines or Medical devices |
http://ico-dc.org/en/wp-content/uploads/2020/10/Establishing-Industrial-Company-Medicines-or-Medical-devices.pdf |
|
|
Basis and Guidelines for the Registration of Biosimilars in Iraq |
http://ico-dc.org/en/wp-content/uploads/2020/10/Iraq-biosimilars-registration-document-final.pdf |
|
|
Investor Guide |
Investor-Guide-2019 |
|
|
MOT/RICE/2/2016 |
Rice 30000 MT ± 5% in minimum |
|
June 28th 2016 |
MOT/Wheat/3/2016 |
Wheat |
|
May 8th 2016 |
MOT/Wheat/2/2016 |
Wheat |
|
April 10th 2016 |
MOT/Rice/6/2015 |
30000 MT (+ / -) 5% in minimum of Rice (1) (2) |
|
November 15th 2015 |
165_NT_2015 |
Underground cables and accessories (1) (2) |
|
October 21st 2015 |
MOT/Rice/5/2015 |
Rice (1) (2) |
|
September 6th 2015 |
2_177 |
Supplying Shunt Reactors and Capacitor banks 11 K.V |
|
September 21st 2015 |
164 / NT / 2015 |
General Directorate of Electrical Energy Production |
|
August 26th 2015 |
1/2015 SIER |
Constructing Laboratories(1) (2) |
|
August 16th 2015 |
1201 |
Supply and installation lev1 flow gauges and temperature sensors |
|
August 3rd 2015 |
MOT/Rice/3/2015 |
Rice Tender (1) (2) |
|
June/28/ 2015 |
42/UE/2015 |
Reconstruction of Ramadi East Substation & Tikrit South Substation |
|
June /7/ 2015 |
E2S-002 |
Preparing 2 Booster Pump (type ZHN12-400) |
|
May/12/2015 |
How does cialis prescription ? cialis or sildenafil citrate is a PDE-5 inhibitor approved by FDA for managing indications of impotency in men. Depending on this |
cheap viagra generic they adjust the dosage. Shilajit ES capsule is helpful in curing Raynaud's phenomenon. viagra shop usa You must visit the psychiatry buy viagra canada clinic in Bhopal. Ministry of Transportation |
Investment Opportunity Announcement |
|
N/A |
5M/2014 |
Supplying distillate Pumps for Nassirriyah Thermal power Station |
|
May/10/2015 |
3M/2014 |
Supplying Main Condensate pumps for Nassirriyah thermal power station |
|
May/12/2015 |
Muthna Gov |
Muthana Governorate invites foreign companies to take part in a tender for the 2014 |
|
April/15/2015 |
7M/2014 |
Supplying Plate of Corten steel for Nassiriyah Thermal power station |
|
April/26/2015 |
4M/2015 |
Supplying current transformer 132 k.v for Nassiriyah Steam Power Station |
|
May/5/2015 |
MOT/Wheat/1/2015 |
Wheat |
|
Feb/15/2015 |
1/T/FUR-1/2015 |
Supervision for caustic soda plant saves operation / investment budget |
|
March/16/2015 |
5/2/24/1180S |
Supply and installation and operation of continuous emission monitoring system |
|
Feb/11/2015 |
5/2/6M/173 |
Ssupplying equipments for the extension 400 K.V Wassit city substations |
|
Feb/15/2015 |
9M/2014 |
Supplying engineering inspections devices for Nassiriyah Thermal Power Station |
|
Feb/22/2015 |
2M/2014 |
Supplying lower bearing of (RAH) for Nassiriyah Thermal Power Station |
|
Feb/23/2015 |
MOT/ RICE/1/2015 |
Rice |
|
Jan/25/2015 |
171/M6/2/5 |
Supply of Silicon Rubber Insulators |
|
Feb/3/2015 |
5-2-18-1214 S |
Supplying and Installation reduction gear box |
|
Jan/14/2015 |
4/T/FUR-1/2014 |
Water Waste Treatment Unit for Chemical Plants |
|
Feb/2/2015 |
Ministry of Transportation |
Strategic Mega Projects (English) |
|
|
Ministry of Transportation |
Strategic Mega Projects (Arabic) |
|
|